WorldViz User Forum  

Go Back   WorldViz User Forum > Vizard

 
 
Thread Tools Rating: Thread Rating: 3 votes, 5.00 average. Display Modes
Prev Previous Post   Next Post Next
  #16  
Old 11-28-2007, 10:16 AM
Elittdogg Elittdogg is offline
Member
 
Join Date: Aug 2007
Posts: 77
Here's the printed output from running it for a bit:

Elapsed time: 60.0057702864 seconds
Movement Transition Made
Elapsed time: 60.0058499055 seconds
Movement Transition Made
Elapsed time: 60.0067419183 seconds
Movement Transition Made
Elapsed time: 60.0055750102 seconds
Movement Transition Made


The time between elapsed time 1 and Movement transition made 1 is about 20 seconds. The time between ET2 and MTM2 is about 25 seconds. The time between ET3 and MTM3 is about 30 seconds. And time between ET4 and MTM4 is about 35 seconds. Granted I'm using a stopwatch so of course there is a little human error delay, but nonetheless it's not even close to being the same.
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 12:56 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
Copyright 2002-2023 WorldViz LLC