#1
|
|||
|
|||
partially stopping tracking
Hi,
I'm using both ppt and intersense for auto-tracking. While running the script, I want to halt just the ppt but allow the intersense to continue functioning. I've tried issuing a viz.tracker(viz.STOP) command, but that shuts down both trackers. Is there a way I can stop just one? Thanks. |
|
|