WorldViz User Forum  

Go Back   WorldViz User Forum > Vizard

 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
  #3  
Old 06-10-2005, 10:16 AM
eagleman eagleman is offline
Member
 
Join Date: Jun 2005
Posts: 3
I mean a 640x480 RGB frame capture. And the data will go both ways: first Matlab will read in the frame and do some analysis. Then it will feed a camera move command to Vizard. When Vizard updates its position to a new view, Matlab will read the next frame capture, and so on. This communication does not need to be real time, but will proceed one frame at a time at whatever rate it takes for Matlab to perform its computations.
Thanks so much in advance for your help.
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 04:05 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
Copyright 2002-2023 WorldViz LLC